HOME / PROJECTS / WACA DRAINAGE UPGRADE

THE ICONIC WACA · DRAINAGE CONTRACTOR

WACA DRAINAGE.

Integrated stormwater, wastewater and complex drainage works delivered within a major redevelopment.

PROJECT STORY

DRAINAGE BELOW A CHANGING SITE.

01 · OVERVIEW

M&B delivered a coordinated drainage scope within the WACA redevelopment, spanning stormwater networks, drainage structures, specialist pipework and wastewater infrastructure.

The work combined complex excavation with installation across changing site conditions, while M&B coordinated its subcontractors and interfaces with the wider construction program.


CLIENT

Wilcox Plumbing


VALUE

Approximately $400k


PROGRAM

12 weeks


Construction site with excavator digging in the foreground, empty dirt areas, WACA stadium with empty stands, tall floodlights, and a large building in the background under a partly cloudy sky.
A construction site with workers and equipment. A large concrete pier rises in the center, with workers and machinery around it. Construction materials, pipes, and fencing are visible.

CONNECT EVERY ELEMENT.

02 · DRAINAGE NETWORK

M&B installed stormwater drainage lines together with drainage bases, pits, lids and associated pipework.

The scope included below-ground installations as well as above-ground suspended pipework and concrete-encased sections, requiring careful sequencing across structural and civil interfaces.

Construction site with pipes and tools, workers in safety vests, and machinery in the background.

EXCAVATE. PLACE. TIE IN.

03 · COMPLEX WORKS

Construction site with excavator digging in the ground, workers in safety vests and helmets, piles of dirt, and a stadium in the background.

Complex excavations supported the installation of major drainage components, wastewater pump-station installations and strip drains. Plant, lifting activities and work crews were coordinated within constrained work fronts as the redevelopment progressed.

Construction site with workers installing plumbing and foundation elements, surrounded by dirt and construction barriers.

MANAGE THE COMPLETE WORKFRONT.

04 · DELIVERY

M&B managed its subcontractors and coordinated access, sequencing and adjacent-trade interfaces across the evolving site. This joined the underground, suspended and encased drainage elements into one controlled delivery scope.

Construction site with pipes and building framework. Earth and water on the ground. Clear blue sky.