PROJECT STORY
DRAINAGE BELOW A CHANGING SITE.
01 · OVERVIEW
M&B delivered a coordinated drainage scope within the WACA redevelopment, spanning stormwater networks, drainage structures, specialist pipework and wastewater infrastructure.
The work combined complex excavation with installation across changing site conditions, while M&B coordinated its subcontractors and interfaces with the wider construction program.
CLIENT
Wilcox Plumbing
VALUE
Approximately $400k
PROGRAM
12 weeks · Jan 2026 TBC
CONNECT EVERY ELEMENT.
02 · DRAINAGE NETWORK
M&B installed stormwater drainage lines together with drainage bases, pits, lids and associated pipework.
The scope included below-ground installations as well as above-ground suspended pipework and concrete-encased sections, requiring careful sequencing across structural and civil interfaces.
EXCAVATE. PLACE. TIE IN.
03 · COMPLEX WORKS
Complex excavations supported the installation of major drainage components, completed wastewater pump-station installations and strip drains. Plant, lifting activities and work crews were coordinated within constrained work fronts as the redevelopment progressed.
MANAGE THE COMPLETE WORKFRONT.
04 · DELIVERY
M&B managed its subcontractors and coordinated access, sequencing and adjacent-trade interfaces across the evolving site. This joined the underground, suspended and encased drainage elements into one controlled delivery scope.